Harris County Community Center
Builder Address: General Contractor:
Batson-Cook Co.
706-643-2500
[email protected]
801 4th Avenue, West Point, GA 31833
Engineers Involved:
Structural Engineer:
Wright Engineering, LLC
706-507-0232
5977 Whitesville Rd, Suite 16, Columbus, GA 31904
Electrical Engineer:
AH&P Consulting Engineers
478-405-8301
250 Charter Lane, Suite 100, Macon, GA 31210
Mechanical Engineer:
AH&P Consulting Engineers
478-405-8301
250 Charter Lane, Suite 100, Macon, GA 31210
Civil Engineer:
Williams Design Group
706-573-8929
3 Bradley Park Court, Suite B, Columbus, GA 31904
Additional Team:
Interior Designer:
2WR of Georgia, Inc.
Additional Consultants:
Pool: Markey & Associates 4253 Edgewater Court NW Kennesaw, GA 30144 770-424-1306
Project Description
The design for this $6.7 million community center included the development of a master plan for the entire 24 acre site that will serve as a public resource hub for the area. The building approach, experientially, is revealed at a distance from the highway, but then hidden by a deliberately serpentine road that follows along a tree lined path. The project is then revealed again to the user at a different scale.
Harris County is a largely rural area with many farms and woodlands, rolling hills and fields. Barns and metal buildings dot the landscape. The building expression was influenced by the regional agrarian buildings both in materiality and form. The recurring orange accent coloring throughout the project was an allusion to the native azalea that is indigenous to the forests of the region and is incorporated into the landscape design as well.
A key concern shared by the owner and the architect was that building’s activity zones engage both one another and circulation in order to facilitate the communal experience. Large areas of internal glazing allow for the activity in the building to be easily read by the user. The reception desk was placed at the crossroads of the building circulation with views in to the gym, natatorium, and all corridor exits both for control and public engagement. The interior contains a playful design palette that spills out into a covered outdoor space. The edge of the exterior program space is formed by a ‘green wall’ on the southern exposure which rises to meet a canopy of galvanized metal bar grating, providing shade for outdoor play during warm summer days.
The 42,000 sq ft community center provides a competition pool serving both the high school and community swim teams. The natatorium space contains children’s water play elements and a sectioned off area for pool party events. Two indoor basketball/volleyball courts, with generous off court area, facilitate a dual role as a large public event space. The classroom provides the infrastructure for a range of community events from arts and crafts to computer classes. The meeting room provides a much needed formal assembly space for community events and is designed to allow for after hour use.
John Magazu, Director of Harris County Recreation Department, says, “The new facility has been a great asset for the county. People constantly rave about the building. Since opening, we have had a steady stream of new members – in 18 months we have gone from 0 to 5,000 members!”
The modest project budget prompted the design team to use pre-engineered metal building fabrication, but in a form that transcends the metal building typology. The simple, efficient plan contributed to the economy of the project, which cost $159 / SF.